top of page

The Hidden Cost of Passing on Materials at Cost (And How It’s Quietly Eating Your Profit)

Bryce Allomes
Nov 15
4 min read

Updated: 4 days ago

By Bryce Allomes | Allomes Accounting | Newcastle, Lake Macquarie & Maitland

Picture a standard Tuesday morning.

You pull into the trade supplier at 7:15 AM to grab materials for a job. There’s a queue at the counter. The yard worker is tied up loading another truck. By the time you’ve signed the docket, loaded the ute, strapped everything down and driven to site, an hour and a half of your morning is gone.

Two days into the job, you’re two fittings short — or the supplier packed the wrong size. Someone has to jump back in the ute, sit in traffic across Newcastle or the M1, and do a second run.

At the end of the week, you sit down to invoice the client. You look at the supplier receipt — say, $1,200 excluding GST — and put $1,200 on the customer’s bill. After all, you didn’t make the gear, so passing it on at cost feels fair.

But if your quote only recovers the supplier invoice, who pays for the time, trips and extra materials needed to supply the job? Unless those amounts are recovered elsewhere, they reduce the return you get from your work.

Where your profit can leak

The sticker price on the invoice is only part of the equation. When reviewing your job costs, look for these five items:

1. Procurement and counter time. Ordering, chasing quotes, waiting at the trade desk and checking deliveries all take time. Your quote needs a way to recover that work.

2. Loading, unloading and site handling. Moving stock from the yard to your ute, and from your ute onto the job site, uses labour hours.

3. The missing fittings run. Even well-planned jobs hit snags. An extra trip for a small part can take someone away from chargeable work and add vehicle costs.

4. Fuel, tolls and vehicle running costs. Running a loaded ute around Newcastle, Lake Macquarie, Maitland and the Hunter adds costs. Check what is already covered in your hourly rate before adding a separate allowance.

5. Offcuts, wastage and consumables. Full lengths, damaged stock, screws, glue, blades and tape need to be allowed for. Only add an extra allowance if these purchases are not already included in your materials total.

Let’s look at the numbers

For this illustrative example, the supplier receipt is $1,200, your procurement time is valued at a $95 hourly charge-out rate, and another $120 of materials and consumables is purchased for wastage. All figures exclude GST.

Supplier receipt: $1,200.00

1.5 hours ordering, counter wait and loading × $95: $142.50

1.0 hour extra run for missing fittings × $95: $95.00

Fuel and vehicle running costs: $35.00

Additional materials / wastage allowance (10% of $1,200): $120.00

Total recovery target before any further margin: $1,592.50.

Billing $1,200 for the materials leaves $392.50 of time value and extra costs unrecovered in this example. Recovering that amount through the materials price requires a 32.7% uplift on the original receipt.

The time component needs care: a charge-out rate represents revenue you could otherwise earn, rather than a cash expense. The $1,592.50 is therefore a pricing recovery target, not a statement that you paid that amount out of your bank account. For a cost-based calculation, substitute your actual labour cost rate.

If you choose a 20% margin on the selling price after including that recovery target, calculate $1,592.50 ÷ 0.80 = $1,990.625. Rounded up to cents, the material quote is $1,990.63 excluding GST. The 20% is an example assumption, not a standard rate for every trade or job.

Why markup and margin trip tradies up

Markup is the percentage added to the cost or recovery base. Margin is the contribution expressed as a percentage of the final selling price.

For example, a $1,600 cost plus a 20% markup produces a $1,920 selling price. The $320 difference is 16.7% of that selling price. To achieve a 20% margin on a $1,600 cost, the selling price needs to be $2,000.

That difference is still not net business profit. Other job labour, overheads, finance costs and tax may need to be covered.

Build the recovery into your quote

Your quote can recover procurement and handling through the material price, a labour allowance, a supply or delivery fee, or a combination that suits your business and agreed scope. The key is to make the allowance deliberately and avoid recovering the same cost twice.

Check whether your labour rate already includes vehicle costs or procurement time. If the supplier receipt already includes the full quantity bought, including all offcuts, do not add the same wastage again. Set out your total customer price and scope clearly before the job begins.

Try your own figures

Use our Materials & Quote Markup calculator in the Business Calculators section to change the receipt amount, supplier run time, hourly time value, vehicle costs, extra materials and target margin.

Want a second set of eyes on your numbers?

At Allomes Accounting, we work with builders, sparkies, plumbers, landscapers and trade businesses across Newcastle, Lake Macquarie and Maitland to review quoting, job costing and business performance.

If you’re flat out on the tools but feel your bank balance isn’t reflecting the hours you put in, book a free 15-minute introductory call with Bryce to discuss your labour rates, materials pricing and overhead recovery.

DREAM IT → BUILD IT → GROW IT → INVEST IN IT → LIVE IT


About the author


Bryce Allomes leads Allomes Accounting, supporting individuals, families, business owners and SMSF trustees across Newcastle, Maitland and Lake Macquarie. His work covers accounting, taxation, financial reporting, cash flow and business advisory.


 
 
 

Comments


bottom of page